Intelligent Distributed Controls
Specialists in the design and manufacture of wireless products and systems

IDC Ltd 2013   All rights reserved

Privacy Policy  |  Terms & Conditions

(+44) 01332 604030
sales@idc-limited.co.uk

IDC Ltd

Keynes House

Alfreton Road, Chester Park

Derby   DE21 4AS

Make an Enquiry

Facilities & Energy Management

3-Phase Power Monitoring

To monitor power usage on a larger scale IDC offers a 3-Phase meter that can send back its data wirelessly via the same gateway that interacts with our other products. This gives the advantage of not having to wire the meter into a computer / PLC and also means that real savings can be made when there are multiple meters to install.


The meter is designed to monitor all 3 phase’s and the neutral if required. The meter installation is shown below:

L1

L2

L3

Neutral

Phase 1

Phase 3

Neutral

Note. The neutral current transformer is optional.


When using the 3-Phase meter it is important to specify what type of current transformers you will be using as this information needs to be programmed into the Power Meter.

Fuses

Current Transformers

3-Phase Meter

Gateway

Phase 2

Zigbee